SBE urges FCC to reject medical micropower networks proposed frequency use

Aug 18, 2009 11:34 AM, By Phil Kurz


             

The Society of Broadcast Engineers told the FCC last week that a proposal to allow new wideband medical micropower networks (MMN) to use 24MHz of spectrum on a secondary basis between 413MHz and 457MHz should be rejected because incumbent users of the band, including broadcasters employing remote pickup stations, are likely to cause harmful interference to the medical devices.

Filing comments Aug. 11, the SBE was responding to a Notice of Proposed Rulemaking issued in March regarding the use of neuromuscular microstimulation devices using wireless technology in the 413MHz-419MHz, 426-432MHz, 438-444MHz and 451-457MHz bands. The commission issued the notice after receiving a petition for rulemaking submitted by the Alfred Mann Foundation seeking to market the devices.

While expressing concern that allowing the MMN devices to use the proposed bands would subject them to interference from a range of incumbents, the SBE comments focused mostly on Part 74, Subpart D, Remote Pickup (RPU) stations, particularly those operating in the 450MHz-451MHz and 455MHz-456MHz bands.

According to the comments, “RPU remote broadcasts can have long transmit duty cycles and effective radiated powers in the 40W-100W range. These lawful Part 74 transmissions are likely to interfere with, and therefore pose risks to, patients using MMN devices.”

The SBE reminded the commission that there currently is spectrum reserved for medical applications in the Part 95 Wireless Medical Telemetry Service. To allow the proposed devices (even on a secondary basis) into the desired spectrum would in effect downgrade incumbents to a de facto secondary service status to maintain the health of users of the MMN devices.

It is unlikely that MMN devices will have interference rejection capabilities sufficient to “withstand high power, cochannel transmissions from RPUs, military radars, land mobile systems, amateur radio and other licensed, mobile and itinerant transmitting facilities without danger to patients,” the filing said.

The SBE cautioned the commission not to walk down a path similar to one it traversed when it authorized body-worn Part 15 medical telemetry devices to use TV Channels 7, 9 and 11. Doing so required primary-service, full-power DTV channels to first check with community healthcare facilities before transitioning to those channels despite the fact that Part 15 rules require acceptance of interference from licensed users.

The SBE also rejected the assertion by the Alfred Mann Foundation that using redundant coding can protect MMN devices from cochannel interference. According to the SBE, “... there are limits to what redundant coding can do in the presence of a strong cochannel interfering signal.”

“An MMN implanted device will have an ERP of -7dBm, while typical RPU base stations may have 46dBm to 50dBm ERP. Perhaps multiple layers of redundant coding would protect MMNs from adjacent-channel RPU operations at 450MHz-451MHz, but practical applications have shown that no amount of redundant coding will protect a 451MHz-457MHz MMN from cochannel RPU operations at 455MHz-456MHz,” the filing said.


Want to use this article?
Click here for options!
Get Copyright Clearance


blog comments powered by Disqus

Related Newsletter

HD Technology Update
A twice-monthly newsletter covering high definition technology through example applications.

Confused about the terminology in an article? Find definitions of common terms and abbreviations in Broadcast Engineering's Glossary.

 

Browse Back Issues

Featured White Papers

A Mechanism to Recover Lost MPEG / IP Delivery Data in Real Time

sponsored by: Sencore

In the ever advancing world of media content delivery, MPEG over IP (MPEG/IP) has been gaining popularity for a number of reasons. MPEG/IP delivery offers lower costs, higher bandwidth, greater efficiency, and new application possibilities over the traditional methods, such as: Asynchronous Transfer Mode (ATM) and RF networks. Along with the benefits, come a number of challenges. One of the biggest challenges is a mechanism to recover lost data in real-time. This paper will attempt to shed some light on the inner workings of the real-time data recovery mechanism: Pro-MPEG Code of Practice #3 Forward Error Correction (CoP#3 FEC). Read Now

Increase Multi Camera Studio Production with Instant Tapeless Technology

sponsored by: EVS

This white paper introduces you to EVS Instant Tapeless Technology and will explain how to apply it in multi-camera studio production for dramas, series, talk shows, and any other studio productions.... Read Now.

Resources

Broadcast Engineering Newsletters Broadcast Engineering Essential Guides Broadcast Engineering White Papers Broadcast Engineering Videos Broadcast Engineering Podcasts Broadcast Engineering Industry Calendar

Industry Calendar

Broadcast Engineering Glossary of Terms

Glossary

Broadcast Engineering RSS feed

RSS

Interactive Media

Broadcast Engineering Webinars Broadcast Engineering Training Broadcast Engineering Blogs Broadcast Engineering Forums Broadcast Engineering on Facebook

Facebook

Broadcast Engineering JobZone

JobZone

Broadcast Engineering BE Roll

Blog

 

Back to Top