FCC acts on DTV extension applications

Jan 1, 2004 12:00 PM, BY HARRY C. MARTIN

    

The full commission recently granted additional third-time extensions to complete construction of digital television facilities to a group of 104 stations, while it denied extensions to seven others and deferred any decision with regard to 30 TV satellite stations.

The commission accepted a variety of justifications for the requested extensions. They included adverse weather, unexpected equipment failures, delay or failure in delivery of equipment, and natural disasters. Some stations claimed they faced difficulties in obtaining necessary local, state or federal approvals needed for the construction of new towers, although the stations involved have diligently sought to overcome those obstacles. Other stations were said to be awaiting commission action on modification applications, channel change rule-making proceedings, special temporary authorization (STA) requests, or assignment applications. Further extensions were granted to another group of stations due to ongoing financial difficulties, which the stations said they were working to resolve. Some group owners had proposed, among other plans, a staggered timetable for completing construction of their multiple stations.

Thirty other stations that operate as “satellites” had their construction deadlines deferred pending the resolution of a rule-making proceeding to determine whether such stations should be allowed to turn in their digital authorizations, forego simulcasting, and simply make a “flashcut” switch to DTV at the end of the transition period.

Seven stations had their extension requests denied. The common thread leading to denial was the commission's conclusion that these stations had not taken sufficient actions during the most recent extension period or had not provided any new reasons to justify further delay. The good news for stations in this group, however, is that they were nonetheless given a final six months to finish DTV construction. The stations were admonished, and they must submit periodic progress reports to the commission. These stations also face the threat of additional sanctions if they fail to submit the required reports, if the commission determines that they were acting in bad faith, or if they fail to commence DTV operation within six months.

All-digital TV tuner rule upheld

All TV sets sold in the United States must include DTV tuners by 2007. That's the final word from the U.S. Court of Appeals, which denied an appeal from makers of TV sets, VCRs and DVD players, all of whom sought to block the FCC's 2007 deadline.

The consumer equipment manufacturers argued that most people do not want or need digital tuners because they get a full panoply of digital features through their cable or satellite providers' set-top boxes. But the court found the FCC had legal authority to impose the deadline on manufacturers. The commission wanted consumers to be able to plug in and immediately use a new TV to receive free over-the-air broadcasts. Without a built-in digital tuner, consumers would have to buy an external decoder if they lacked cable or DBS service.

The commission is phasing in digital-ready requirements. Beginning next year, half of all big-screen TVs larger than 36 inches must have digital capacity. By July 2007, all sets 13 inches or larger, as well as VCRs and DVD players, also must be DTV-ready. Pocket-sized or wristwatch TVs will not be required to have digital tuners — although those that do not come so equipped will require external digital decoders to receive increasingly prevalent DTV broadcasts.


Harry C. Martin is an attorney with Fletcher, Heald & Hildreth PLC, Arlington, VA.

Send questions and comments to: harry_martin@primediabusiness.com

Dateline

TV stations in D.C., Maryland, Virginia and West Virginia must begin their pre-filing renewal announcements on April 1, 2004, in preparation for filing their renewal applications on June 1, 2004. Also on April 1, stations in Delaware, Indiana, Kentucky, Pennsylvania, Tennessee and Texas must place their annual EEO reports in their public files.


Home | Back to the top | Write us





Want to use this article?
Click here for options!
Get Copyright Clearance

Share this article

blog comments powered by Disqus

 

Brad on Broadcast


Current Issue

Online captioning compliance

May 2012

The FCC has issued captioning requirements for all online video. Learn how to meet the requirements of the new rules and how to automate the technical process.

Read More articles...

Check out videos from IBC 2011

BE@IBC Blog

Read More from IBC...


Recent Comments

Powered by Disqus

 


Submit your product for our NAB coverage.

Interactive Media

Broadcast Engineering Webinars Broadcast Engineering Training Broadcast Engineering Blogs Broadcast Engineering Mobile Apps Broadcast Engineering on Facebook

Facebook

Broadcast Engineering JobZone

JobZone

Broadcast Engineering BE Roll

Blog

Featured Products

A Broadcaster's Guide To Camera & Lens Technology

A Broadcaster's Guide To Camera & Lens TechnologyThis eBook provides both new and veteran shooters an in-depth understanding of the technology that lies between the camera lens and the recording medium and how to maximize a camera's performance.

File Based Technology and Workflow

File Based Technology and WorkflowFile-based technologies have replaced video tape methods for a majority of production and broadcast operations. The worlds of AV and IT are coalescing to create new methods and workflows for media

Digital Television Fundamentals

Digital Television FundamentalsThis course, written by broadcast engineer Phil Cianci, provides a basic tutorial platform on the hows and whys of ATSC digital operation.

Video Compression, Editing and Displays

Video Compression, Editing and DisplaysVideo compression, editing and displays is an in-depth tutorial on MPEG compression technology, editing MPEG content and evaluating color video monitors written by long-time video expert, trainer and writer Steve Mullen, Ph. D.

 

Sound Off Podcasts

 

Broadcast Engineering Digital Reference Guide

Browse Back Issues

Back to Top