FCC Wireless Bureau clarifies ULS automatic termination questions

Mar 1, 2006 8:00 AM, News Technology Update e-newsletter


         Subscribe in NewsGator Online   Subscribe in Bloglines

A Feb. 13 letter from the FCC Wireless Telecommunications Bureau to the Society of Broadcast Engineers seeks to clarify questions surrounding how the automatic termination of wireless radio service authorizations in the Universal Licensing System will affect Part 74 Broadcast Auxiliary Services (BAS).

The letter from deputy bureau chief Cathleen Massey to SBE General Counsel Chris Imlay clarifies that Part 74 BAS is covered by the automatic termination provisions. The SBE previously inquired about whether or not Part 74 was covered because it was not listed in two footnotes of the 2005 Declaratory Ruling establishing the automatic termination.

The letter also clarified the issue of “reversion” after automatic termination. The Massey letter drew a distinction between modifications to an application that seeks to change “parameters on an existing license but does not add frequencies” and those in which frequencies are added or modified. In the former case, no notification of completion of construction filing is required. In the latter, such notification is required.

The letter also stated that previous SBE assertions that said if a notification of completion of construction is not timely filed after a license modification, the license will revert to the prior licensed status are incorrect. According to Massey’s letter, there is only a single automatic termination scenario where the license reverts to its previous status. The letter from Massey endorsed a two-step approach the SBE devised to protect existing parameters during the construction period for modified parameters. The SBE recommended that a licensee file an application for a new facility instead of a modified facility and upon constructing the new facility timely file a notification of completion of construction and cancellation of the old license simultaneously.

To read the letter, visit http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-06-334A1.pdf.

Back to the top



Commenting terms of use blog comments powered by Disqus

Want to use this article?
Click here for options!
Get Copyright Clearance

--->

Related Newsletter

News Technology Update
A twice-monthly newsletter covering the equipment used to produce the news.

Confused about the termnology in an article? Find definitions of common terms and abbreviations in Broadcast Engineering's Glossary.

 

Browse Back Issues

Resources

Broadcast Engineering Newsletters Broadcast Engineering Essential Guides Broadcast Engineering White Papers Broadcast Engineering Videos Broadcast Engineering Podcasts Broadcast Engineering Buyers Guide Broadcast Engineering Industry Calendar

Industry Calendar

Broadcast Engineering Glossary of Terms

Glossary

Broadcast Engineering RSS feed

RSS

Interactive Media

Broadcast Engineering Webinars Broadcast Engineering Training Broadcast Engineering Blogs Broadcast Engineering Forums Broadcast Engineering JobZone

JobZone

Broadcast Engineering BE Roll

Blog

 

Back to Top